More than 24 hours after a massive fire at A Kelowna construction site reduced a 4-storey condo project to pile of charred lumber, the area surrounding the fire remains completely off limits to cars and people.
The problem towering over the neighbourhood is the structural integrity of the construction site’s crane.
Blaze
Crane integrity at construction fire site still unknown
More Videos
You are viewing an Accelerated Mobile Webpage.
View Original Article