An historic covered bridge in southern New Brunswick that was heavily damaged by ice and flood waters on the weekend will be demolished.
The Bell Bridge in Hoyt, which was built in 1931, will be replaced with a new single lane, steel bridge that will be located a metre higher in an effort to better survive future floods.
READ MORE: Weekend storm claims another historic covered bridge in New Brunswick
Transportation Minister Bill Fraser says it will be six to eight weeks before the new, modular bridge is complete.
Get daily National news
In the meantime, a contractor with a heavy-duty vehicle has been hired to provide taxi service to residents stranded by the bridge closure and unable to drive on a rough woods road into the area.
The Bell Bridge is one of three covered bridges in Hoyt, but residents say it was a significant landmark and favoured gathering spot.
WATCH: N.B. covered bridge damaged by crash
- Son of slain Lumby woman testifies in 2nd-degree murder trial of Vitali Stefanski
- B.C. First Nation wants treaty process paused or they could exercise civil disobedience
- Saskatoon researchers in ‘very early stages’ of animal testing for hantavirus vaccine
- Reported Germany-Canada LNG deal would bolster investment case for Ksi Lisims: David Eby
New Brunswick reportedly had about 340 covered bridges in the early 1940s, but once the Bell Bridge is removed, that number will be just 58.
They remain a major part of tourism marketing for the province – which calls them “kissing bridges” and offers a map of them.
Comments
Want to discuss? Please read our Commenting Policy first.