December 9 2019 5:45pm

Final section of the 407 toll road opens to motorists

The wait is finally over. The last section of the 407 is open , months ahead of schedule.
The 14-k long chunk between the 35/115 highway at Kirby and Taunton Road opened without fanfare.
But as Dan Nyznik reports, drivers wasted no time getting on the toll-road.

Responsive site?