Wed, Nov 30: Ontario’s auditor general says the province’s public transportation agency isn’t being as careful as it could be managing billions of dollars in infrastructure projects. As Sean O’Shea reports, she discovered a pedestrian bridge truss was installed upside down during an audit.
Global News at 5:30 Toronto
Metrolinx too soft on contractors: Ontario Auditor General
More Videos
-
Overnight fires may be linked to Toronto tow truck wars
-
Parents of 13-year-old girl killed in Lake Rosseau boat crash say other boat driver involved collision was impaired
-
Cộng Cà Phê brews up Vietnamese coffee with first North American location
-
Closing arguments made in Dallas Ly murder trial
-
Snow leopard at Toronto Zoo gives birth to 2 cubs
-
Power restored to thousands in Toronto after squirrel knocks out power
You are viewing an Accelerated Mobile Webpage.
View Original Article