White Rock Pier Cost To Repair
-
White Rock mayor says pier on track to reopen by end of AugustA 30-metre section of the pier was destroyed by a devastating windstorm on Dec. 20, 2018. Crews have been hard at work to repair the damaged section by Aug. 31Jul 31, 2019
-
Facing a $2-million shortfall, White Rock pier repairs to be covered by fundraising effortsFrom selling the new planks to buying "a Beer for the Pier," a local fundraising committee has launched plenty of initiatives to help the city.May 2, 2019
-
-
Advertisement
-
White Rock pier repair costs could triple: reportThe iconic pier was destroyed in December during a powerful windstorm.Jan 25, 2019
Trending
-
$80M Lotto Max jackpot split between two winning tickets43,442 Read
-
Donald Trump claims B.C.’s ‘very large faucet’ could help California’s water woes41,511 Read
-
Ottawa will cut back again on international students with 2025 cap22,568 Read
-
A day after trail-blazing ballerina dies at 29, her mother dies too19,430 Read
-
Health Canada gives 1 year to remove BVO from drinks. What are the risks?16,549 Read
-
Quebec military base accident: 16 soldiers released from hospital, investigation underway10,670 Read
-
Top Videos
-
Ottawa woman takes home $70M Lotto Max jackpot179 Viewed
-
Winning $70-million Lotto Max ticket sold to Ottawa resident98 Viewed
-
Canada imposes further cap on international students: Boissonnault89 Viewed
-
Inflation finally hits Bank of Canada’s 2% target74 Viewed
-
Dozens displaced by south Edmonton fire61 Viewed
-
Does aspartame cause cancer? No more than aloe vera and pickled veggies, based on latest risk level57 Viewed
-