Kelowna’s City Park lakefront walkway is about to get a $1.5 Million facelift.
A 50 meter-stretch of the old stone paved promenade is about to be torn up and replaced with a wider, smoother, concrete multiuse-pathway.
- Wider walkway, better protected beaches with City Park upgrades
- Construction underway to replace stretch of Kelowna’s City Park walkway