City engineering manager Brad Neirinck told Global Winnipeg the move to close the bridge Tuesday wasn’t a snap decision.
‘No band-aid solutions’: City engineer on Arlington Bridge woes
More Videos
-
Sudan crisis: Refugees resorting to ‘extreme measures’ to survive famine, WFP says
-
World-renowned detective tees off at Vertigo Theatre to solve another mystery
-
Two young girls struck by vehicle in Ajax
-
B.C. teen remains in Children’s Hospital with H5N1 avian flu
-
Does this viral smoothie really contain the secret ingredients to weight loss?
-
Julian Black Antelope on “NCIS: Origins” and empowering Indigenous talent
You are viewing an Accelerated Mobile Webpage.
View Original Article